Printpack, Inc. Expansion
Newport News, Virginia
Square Footage
150,000 SF
Building Type
Commercial
Project Type
Addition
Team
Architect-led
Services Provided
Mechanical, Electrical and Plumbing Design, Construction Administration, Commissioning
Overview
The Printpack Expansion project significantly increased manufacturing capacity at the company’s Newport News facility to support growing demand in flexible packaging. The multi-phase expansion included new production space, process infrastructure, and building system upgrades to support advanced manufacturing operations. The project strengthened Printpack’s long-term operational efficiency while supporting job growth in the region.
Challenges
- Designing building and utility systems capable of supporting high-volume, specialized manufacturing processes.
- Integrating new production space with ongoing plant operations while minimizing downtime.
- Coordinating phased construction to maintain safety, efficiency, and uninterrupted facility performance.
Goals
- Expand manufacturing capacity to accommodate new equipment and increased production demand.
- Provide robust, flexible building systems that support current operations and future growth.
- Improve overall facility efficiency while maintaining operational continuity throughout construction.
Project Team
- Owner: Printpack, Inc.
- Architect: HBA Architecture & Interior Design
- Structural: Speight Marshall Francis
- Civil:
- Contractor: Clancy & Theys Construction Company
Results
- Successfully delivered a major manufacturing expansion supporting advanced flexible packaging production.
- Enhanced facility infrastructure to accommodate new equipment, utilities, and process requirements.
- Supported regional economic growth by enabling job creation and long-term operational scalability.