Virginia Peninsula Community College, Mary T. Christian Theatre, Templin Hall
Key details
Reconstruction - The building replaces a facility that suffered a structural failure and caused a partial collapse.
Architect-led team
PROJECT HIGHLIGHTS
Converted the lighting system to LED.
New theatrical performance equipment, including a counterweight fly system that allows for larger pieces to be stored above the performance area, and new audio-visual equipment.
New seating, flooring, wood paneling and acoustical paneling and improved seating sightlines.
TEAM + SPECIFICS
Opened in 2026
Architect – RRMM Architects
Structural Engineer - Lynch Mykins
Civil Engineer - H2R Engineering
Contractor – WM Jordan Company
49,424 SF