Virginia Peninsula Community College, Mary T. Christian Theatre, Templin Hall

 

Key details

Reconstruction - The building replaces a facility that suffered a structural failure and caused a partial collapse.

Architect-led team

 
 
 

PROJECT HIGHLIGHTS

  • Converted the lighting system to LED.

  • New theatrical performance equipment, including a counterweight fly system that allows for larger pieces to be stored above the performance area, and new audio-visual equipment.

  • New seating, flooring, wood paneling and acoustical paneling and improved seating sightlines.

 
 
 
 

TEAM + SPECIFICS

  • Opened in 2026

  • Architect – RRMM Architects

  • Structural Engineer - Lynch Mykins

  • Civil Engineer - H2R Engineering

  • Contractor – WM Jordan Company

  • 49,424 SF

 
 