Rosemont Forest Elementary School

Key details

HVAC Replacement

Architect-led team

 

PROJECT HIGHLIGHTS

  • Replacement of the existing HVAC system with a high-efficiency geothermal water source heat pump system, including a newly designed geothermal well field and hydronic distribution network to improve energy performance and occupant comfort.

  • Installation of vertical classroom unit ventilator water source heat pumps with energy recovery, hot gas reheat for humidity control, and integration with a new Tridium automatic temperature controls system.

  • Renovation of the administration wing with an air-cooled VRF system and decoupled dedicated outdoor air system (DOAS), along with electrical infrastructure upgrades to support the new HVAC systems.

  • Careful phasing, Revit-based modeling, and comprehensive construction administration and commissioning to coordinate complex system replacements while maintaining ongoing building operations.

 
 

TEAM + SPECIFICS

  • Completed in 2025

  • Architect – HBA

  • Contractor – D.E. Kirby, Inc.

  • Approximately 81,040 square feet

Previous
Previous

Williamsburg Landing Community Center

Next
Next

Virginia Peninsula Community College, Mary T. Christian Theatre, Templin Hall