Williamsburg Landing Community Center

Key details

New Construction

Architect-led team

 

PROJECT HIGHLIGHTS

  • High-performance HVAC design — implemented a new closed-circuit cooling system and pre-manufactured pump house supplying condenser water to horizontal concealed water-source heat pumps. Rooftop water-source heat pump units serve the theater/stage, and rooftop air-cooled heat pump dedicated outdoor air system (DOAS) units with energy-recovery wheels provide outdoor air and improved efficiency.

  • Includes a modern 300-seat performance theater and flexible gathering areas designed to support performances, social engagement, and community programming.

  • Collaborative design & community focus — project realized through close coordination amongst the team to meet the vision of inclusive, purposeful environments that foster connection and enrich everyday life for residents.

 
 

TEAM + SPECIFICS

  • Completed in 2026

  • Architect – GuernseyTingle

  • Structural Engineer - Terracon

  • Civil Engineer - AES Consulting Engineers

  • General Contractor – W.M. Jordan Company

  • 22,319 square feet

Next
Next

Rosemont Forest Elementary School